We can provide

  • Pre-feasibility studies
  • Feasibility studies
  • Documentation for authorisations procedures
  • Economic and financial studies
  • Hydrological and hydraulic studies
  • Environmental impact assessments
  • Documentation for the environmental impact authorisation
  • Documentation needed for financial support
  • Estimate of the plants value
  • Documentation for water concession or other authorisation requirements
  • Preliminary design
  • Construction design
  • Topographical and geological surveys complementary to design
  • Documentation and assistance on civil and hydraulic works contracts
  • Documentation and assistance on electromechanical equipment contracts
  • Construction supervision
  • Final and ongoing testing
  • Assistance to the plants commissioning
  • Operation and maintenance manuals for hydroelectric plants
  • Consulting on plants operation and management

 

Untitled Document

Why Fonko Hydro?

Fonko Hydro is a SHPP (Small Hydro Power Plant) SPECIALIST, offering feasibility, design, consenting and installation expertise for small-scale hydropower projects throughout Republic of Macedonia. We pride ourselves on delivering the highest quality projects in the most cost effective way.

  • We set high standards.
  • We offer feasibility study, and We apply advanced methodology of designing, and we continually innovate and improve.
  • Customers and partners will see us as integral to their success. We will anticipate their needs and deliver on every commitment we make.
  • Uncompromising integrity, honesty, and fairness are at the heart of our company.
  • We work by our Covenants, which encourage openness, teamwork, and trust.
{gallery}banners{/gallery}
Untitled Document
Why Invest In SHPP In Macedonia
  • So far, 5 tenders for concession of SHPP locations were conducted,
  • 66 concession agreements were concluded with investment value of 110 mil. EUR.
  • Feed-in tariffs range from 45 to 120 EUR/MWh
  • Concessions are offered for 23 Years.
  • 10% Flat Corporate Income Tax rate.
  • Possibility of VAT refund
  • Construction costs are the lowest in the region
  • Full electricity market liberalization by 2015.
  • IRR on SHPPs in Macedonia can vary between 8% and 14%.
  • Energy demand is expected to grow by 2.6 percent annually over the next decade
  • Energy Development Strategy until 2030Strategy for utilization of RES until 2020
Untitled Document
Small Hydro Power Plant Concept A

Small Hydro Power Plant / Project Concept A - Fonko Hydro Macedonia

Untitled Document
Small Hydro Power Plant Concept B

Small Hydro Power Plant / Project Concept A - Fonko Hydro Macedonia